Panaxis Site, for contractors and developers

Construction ERP for the site and the office

Your engineers record work on their phones, even in a basement with no signal. The office checks it against the BOQ and approves it. Munshi, your built-in assistant, drafts entries and chases missing reports.

Offline capture Entries wait on the phone until they sync
Excel BOQ import Each row is checked on import
Runs in a phone browser No app to install
Illustration of a civil engineer in a safety vest and helmet checking site work on a phone
Panaxis Site on a phone
Demo: 20 mm steel delivery Needs review
Challan weight 20,000 kg
Measured weight per metre 2.37 kg/m
Theoretical weight per metre 2.47 kg/m
Difference per metre -4.05%, outside ±3%
Rolling margin: -844 kg

For this length of bar, the theoretical weight is 844 kg above the challan weight. The project manager decides how to handle it.

The decision and its reason stay on the record Held for review

Four everyday site problems

You've probably seen these on your own sites.

Illustration of a storekeeper inspecting steel at a construction site gate

Steel arrives, and nobody checks the weight per metre

On site today

A steel truck reaches the gate while the storekeeper is busy with another delivery. The challan gives the load weight, and nobody compares it with the actual weight per metre of the bars.

A rolling margin difference goes unnoticed, because the challan and the inspection notes sit in separate registers.
With Panaxis Site

The storekeeper records the measured weight per metre beside the delivery. Panaxis Site works out the bar length from the challan weight and compares it with the theoretical weight under IS 1786.

If the difference is outside the tolerance for that diameter, a person reviews it. The alert alone does not prove a loss or a fault.
Illustration of workers on a concrete pour

The basement has no signal, and the pour is under way

On site today

The team is pouring a basement slab. The engineer has no signal, and the office needs the quantity against the right floor and contractor, so it goes on a paper note.

If the note goes missing, any later dispute about the quantity comes down to memory.
With Panaxis Site

The engineer records the activity, location, contractor, and quantity on a phone at the slab. The entry stays on the phone until the connection returns.

Once it syncs, the entry goes through server checks and manager review.
Illustration of an engineer checking site work on a phone

Extra work gets agreed on site and disputed at month-end

On site today

A contractor is asked on site to add work. The instruction is verbal, and the approved BOQ is in an office spreadsheet. At month-end, the two sides remember it differently.

The report no longer matches the approved scope, which makes the bill harder to review.
With Panaxis Site

Daily reports are checked against the approved BOQ, so the manager sees a quantity exception when it happens.

The manager can ask for the reason and raise a variation before approving the report.
Illustration of a project manager reviewing site records

The promoter asks about progress and gets photos

On site today

The promoter asks whether Tower B is on schedule. The reply is a run of site photos and voice notes, with no comparison of planned and achieved work.

More calls follow, to find out which activity slipped, why, and who still has to decide.
With Panaxis Site

Panaxis Site keeps each activity's quantity, location, and shortfall reason together. Munshi turns the approved records into an evening brief for management.

Management can review progress and pending decisions, then call the right person.

An example day on site

One day, with the record each step leaves behind.

Day 1, setup Office
Quantity surveyor

Import and approve the BOQ

The quantity surveyor imports the Excel BOQ, fixes any rows that fail the checks, and approves the baseline for daily reports.

Later changes need a variation order.
7:30 AM, gate Site gate
Storekeeper

Check the delivery

A delivery reaches the gate. The storekeeper records the load, separates rejected material, and checks steel weight per metre against IS 1786.

Rejected material never enters available stock.
11:00 AM, slab Work location
Site engineer

Record the day's progress

At the basement slab, the engineer records the activity, contractor, and quantity on a phone. With no signal, the entry waits on the phone.

Server checks run once the phone is back online.
5:15 PM, office Site office
Project manager

Review the report against the BOQ

Back in signal, the entry reaches the office. The manager checks the quantities against the BOQ, then approves the report or returns it with a reason.

Munshi flags exceptions, and the manager decides.
7:00 PM, review Office
Management

See progress and exceptions

The promoter opens the evening view: approved progress against plan, shortfall reasons, and decisions waiting for review. The team can export the records.

Each shortfall shows its reason next to the quantity.

What Panaxis Site covers

Everything your team needs, grouped by the job.

Project setup and budget

Projects and access
Set up companies, projects, roles, and contractors, with a log of who changed what.
Work breakdown
Organise work by discipline, activity, block, floor, and zone.
BOQ import
Bring in your BOQ from Excel or CSV, with checks on each row.
Budget baseline
Analyse rates, approve the budget, and lock it. Later changes go through a variation order.

Daily progress and planning

Offline daily reports
Record quantities and photos on a phone, even with no signal. Entries sync when the connection returns.
Manager review
Approve a report or return it with comments. Cumulative quantities change only on approval.
Monthly plan and tracker
Compare planned and achieved work, with a required reason for each shortfall and a delay forecast.
Price and material checks
Watch rate changes against the baseline, and compare expected material use with store issues.
Owner dashboard
See missing reports, progress, shortfalls, overrides, and pending approvals across projects.
Reports and exports
Share a PDF with your logo, or export reports to Excel.

Materials and store

Material requests
Raise indents from site, checked against BOQ quantities and budget limits.
Goods receipts
Check deliveries against the challan, including part deliveries. Accepted and rejected quantities stay separate.
Stock ledger
Track receipts, issues, returns, transfers, and adjustments. Rejected material never enters available stock.
Opening stock import
Bring in existing store balances from Excel or CSV when onboarding a site.
Physical stock counts
Run cycle counts in the store and reconcile differences against the stock ledger.
Steel rolling margin
Compare received weight with theoretical weight by diameter, and flag differences outside tolerance.

Procurement

Quotes and comparison
Send requests for quotation and compare what vendors offer.
Purchase orders
Create purchase orders with approval limits that you set.
Three-way match
Hold an invoice when the purchase order, accepted receipt, and supplier invoice do not match.

Quality and snagging

Inspections
Run inspection requests and checklists with pass or fail results.
Non-conformance reports
Record corrective actions and re-inspections. An open report blocks the linked bill line.
Snag list
Track snags with photos, location, severity, and assignee through to closure.

Billing and accounts

Work orders
Set subcontractor scope, unit rates, and contract limits.
Measurement book
Record joint measurements and quantity surveyor verification.
Running account bills
Handle retention, advance recovery, debit notes, and statutory deductions.
Tally export
Export sales bills and purchase invoices in a format that Tally can import.

Labour, plant, and machinery

Labour
Keep a worker register, site attendance, wage rates, and overtime, allocated to activities.
Petty cash
Log site cash by expense type.
Plant and production
Manage production orders, raw material use, output, and dispatch for RMC, hot mix, and crushers.
Machinery and fuel
Track owned and hired equipment, running hours, fuel issues, and maintenance.

Sales and handover

Leads and bookings
Track enquiries and unit bookings.
Customer payments
Set milestone payment schedules, with a review before each demand goes out.
Handover
Run joint client inspections and keep possession documents.
After handover
Log and close service tickets.

Munshi, your site assistant

Munshi Capture
Reads challan photos and drafts the fields. The storekeeper checks and confirms them.
Munshi Chase
Reminds engineers about missing reports.
Munshi Brief
Sends managers an end-of-day summary built from approved records.

Munshi proposes. Your team approves.

Your team decides

Munshi drafts entries and flags problems. A person reviews and approves every record.

Calculations you can check

Checks follow written rules, such as the IS 1786 steel tolerances. Munshi does no arithmetic.

Every decision is recorded

Each approval, return, or correction keeps the person, the time, and the reason.

Works without signal

Entries save on the phone and sync when the connection returns.

Questions

Can we use Panaxis Site today?

Yes, we're in beta. Email us and we'll get you started.

Do we need to install a mobile app?

No. Panaxis Site runs in the browser on your phone, including offline daily reports.

How does offline capture work?

The daily report saves on the phone when there is no signal, and it syncs when the connection returns. Server checks, approvals, and Munshi need a connection.

Will Munshi approve reports or release payments?

No. Munshi drafts entries, flags problems, and sends reminders. Calculations come from written rules. A person confirms every draft, and authorised people approve the records.

What does the steel check tell us?

It works out the bar length from the challan weight and your measured weight per metre, then compares the theoretical weight under IS 1786 with the challan weight. A difference outside the tolerance goes to a person for review. The alert alone does not prove a loss or a fault.

How does Panaxis Site check BOQ quantities?

It adds the submitted daily quantity to the approved work so far, compares the total with the approved BOQ quantity, and shows the manager any exception. It does not certify a contractor bill.

Can we import our existing Excel records?

You can import a BOQ from Excel, with checks on each row. For other records, send us an example file and we'll tell you what it takes.

What will it cost?

Email us about your business and we'll walk you through pricing.

Talk to us about Panaxis Site

We're in beta and taking on new teams. Tell us how yours works.

Email us

Or write to contact@panaxis.in

Or leave your details

We only use these details to reply to you. Read our privacy notice.